Starting the shed pad
|
|
Building the new gateway
|
The new fencing
|
Getting ready to pour the concrete
|
|
Floor going down
|
More concrete
|
Shed starting to go up
|
Trusses are up
|
|
Insulation and sheeting going on
|
|
Sides nearly done
|
Window and door going in
|
Decking on the verandah area
|
Waiting for the grass to come up
|
Ceiling is up
|
Insulation going in
|
Our big exercise yard will go out here
|
Walls are getting gyprocked
|
Gyprock is all up and flushing the joints is nearly done
|
Our country lane, the drive up to the kennels
|
Our new sign
|
Wet area ready for flushing
|
Ready to put up the Bondor panelling
|
Some Bondor panelling is up and the pile that is yet to go up.
|
Bondor panelling dividers for the inside dog runs
|
Painting nearly done
|
The panels going up for the outside part of the dog runs.
|
Bath is in and the waterproofing is done
|
The inside dividers
|
Tiling finished and grouted
|
Granite wall
|
|
One side nearly done
|
Doggy door from outside looking in
|
Doggy doors going in
|
Lino down and desk in.
|
Other side going in
|
Some stickers to brighten up the dog runs
|
Other side all finished, gates on and mesh over the top
|
Mesh over the top to stop and attempted escapes!
|
Inside is just about finished. Just need the mesh over the top.
|
Exercise yards
|
exercise yards
|
exercise yards
|
Internal fence
|
Internal fences and yards. External fence to go
|
finishing off the entrance
|
Perimeter fence is up, only the snake mesh to go on now.
|
Slabs going down, turf next and they are done.
|
Snakemesh is on this side, need bluemetal to bury the bottom into.
|
The kids photos are up
|
Slabs are all down, just the turf to go
|
Ready for a visitor
|
Bundy eating her tea
|
The outside part of the dog runs
|
From the outside looking in
|
Turf in one and a half yards
|
Front Garden bed
|
All the turf is down. Top dressing with sand to fill and gaps and make it level
|
Snake mesh buried into Bluemetal
|
Our sign
|